Building on your own plot
From soil test to occupancy certificate under a single contract, with costs you can check at every stage.
Costs you can check
You get a stage-wise bill of quantities with brands and grades named: cement, steel, waterproofing, electrical and plumbing, plus allowances for tiles and fittings. Payments are released against completed and inspected stages, never against elapsed time.
Approvals first
Plan sanction, khata and conversion status, setbacks and the commencement certificate, sequenced from day one. Building first and regularising later is how people lose years.
Architect-led
The architect sets and holds the design; the contractor builds to drawings rather than improvising on site.
Quality checks that matter
Soil investigation, concrete cube tests at each pour, steel checks and flood-tested waterproofing, with reports shared.
How it works
Feasibility
Plot, soil and what you can build for your budget.
Design
Architecture, structure and services drawings.
Approvals
Plan sanction and commencement certificate.
Construction
Supervised, with weekly photos and a stage log.
Handover
Snagging, testing and occupancy paperwork.
A realistic timeline
For a typical 30×40 or 30×50 site, a ground-plus-two home with mid-range finishes takes roughly 10 to 14 months from commencement, plus two to four months of design and approvals before that. Basements, difficult soil or heavy customisation add time. A much shorter quote usually means compressed curing time or a large variation bill later.
Questions
What does construction cost per square foot in Bangalore?
It depends almost entirely on the specification. A per-square-foot figure means little until the bill of quantities behind it is written down. We price from the BOQ, not the other way round.
Do you handle BBMP or BDA approvals?
Yes. Approvals are part of the scope.